Alcatel Carrier Internetworking Solutions omniswitch User Manual

Page of 260
Managing CMM Directory Content
CMM Files
OmniSwitch 6600 Family Switch Management Guide
March 2005
page 4-5
Software Rollback Configuration Scenarios for a Single Switch
The examples below illustrate a few likely scenarios and explain how the running configuration, working 
directory, and certified directory interoperate to facilitate the software rollback on a single switch. 
Note. This information applies to a switch stack, however the manner in which CMM software is propa-
gated to all switches in a stack is explained in 
In the examples below, R represents the running configuration, W represents the working directory, and C 
represents the certified directory.
Note. For the following scenarios, it is important to remember the difference between where the switch 
boots from, and where the switch is running from. See 
for more information.
Scenario 1: Running Configuration Lost After Reboot
Switch X is new from the factory. It is plugged in and booted up from the certified directory, the contents 
of which are loaded into the running configuration. Since the working and certified directories are exactly 
the same, the switch is running from the working directory. Through the course of several days, changes 
are made to the configuration file in the running configuration. 
Power to the switch is interrupted, the switch reboots from certified directory, all of the changes in the 
running configuration are overwritten, and the switch rolls back to the certified directory (which in this 
case is the factory setting).
This is illustrated in the diagram below:
 
Running Configuration is Overwritten by the Certified Directory on Boot
R
W
C
R
W
C
R
W
C
R
W
C
1. Switch boots 
from certified 
directory using 
factory configura-
tion settings. 
Since the working 
and certified 
directories are the 
same, it will be 
running from the 
working direc-
tory.
2. Changes are 
made to the run-
ning configura-
tion and stored in 
the running con-
figuration.
3. Power is inter-
rupted and the 
switch goes down.
4. Switch reboots 
from certified 
directory using 
factory configura-
tion settings; run-
ning configuration 
changes are lost. 
Since the working 
and certified direc-
tories are the same, 
it will be running 
from the working 
directory.