Allied Telesis X610-24SPS/X User Manual

Page of 128
100-240VAC~ 16A MAX
DC PWR
FAULT
A
T
-PWR1200
2267
Chapter 3: Installing the Hardware
82
Figure 46. AT-PWR1200 Power Supply
Installing a 
VCStack 
Stacking Module
To install a power supply into a POE chassis, perform the following 
procedure:
1. Remove the module from the shipping package.
2330
PO
WER 
S
UPPL
Y
RPS I
56V/18A MAX   
WARNING
This un
it may h
ave more
electric 
shock, discon
ne
unit.
AT-LX4
4CPUCV
R
Note
Store the packaging material in a safe location. You must use the 
original shipping material if you need to return the unit to Allied 
Telesis.
2. Remove the blank panel from the power supply slot on the rear panel 
of the switch by loosening the two captive screws on the panel with a 
cross-head screwdriver, as shown in Figure 47.
Note
The x610-24Ts-POE+, x610-24Ts/X-POE+, x610-48Ts-POE+ and 
 
x610-48Ts/X-POE+ switch chassis are shipped from the factory with 
a blank panel installed in the rear panel power supply slot.
Figure 47. Removing the Blank Panel from the Power Supply Slot