Allied Telesis AT-x510-52GTX User Manual

Page of 90
Chapter 4: Cabling the Networking Ports
66
Installing SFP
and SFP+
Modules
To install SFP and SFP+ transceivers in slots 27 and 28 of the 28-port 
switches and slots 51 and 52 of the 52-port switches, perform the following 
procedure:
1. Remove the dust plug from a transceiver slot on the switch. Refer to 
Figure 24. Removing the Dust Plug from an SFP+ Slot
2. Remove the transceiver from its shipping container and store the 
packaging material in a safe location.
3. If you are installing the transceiver in a top slot, position the 
transceiver with the Allied Telesis label facing up. If you are installing 
the transceiver in a bottom slot, position the transceiver with the label 
facing down.
4. Slide the transceiver into the slot until it clicks into place, as shown in