Allied Telesis AT-x510-52GTX User Manual
![Allied Telesis](https://files.manualsbrain.com/attachments/462516a581cd41e34c63b2661e9146f39cdfc3ab/common/fit/150/50/5a51de7070975571f08ba1bcbc272fbf5b60d69f41f53dd15198063c6333/brand_logo.jpeg)
Chapter 4: Cabling the Networking Ports
66
Installing SFP
and SFP+
Modules
To install SFP and SFP+ transceivers in slots 27 and 28 of the 28-port
switches and slots 51 and 52 of the 52-port switches, perform the following
procedure:
switches and slots 51 and 52 of the 52-port switches, perform the following
procedure:
1. Remove the dust plug from a transceiver slot on the switch. Refer to
Figure 24. Removing the Dust Plug from an SFP+ Slot
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. If you are installing the transceiver in a top slot, position the
transceiver with the Allied Telesis label facing up. If you are installing
the transceiver in a bottom slot, position the transceiver with the label
facing down.
the transceiver in a bottom slot, position the transceiver with the label
facing down.
4. Slide the transceiver into the slot until it clicks into place, as shown in