Allied Telesis AT-SBX31GP24 User Manual
SwitchBlade x3112 Installation Guide
75
Installing the AT-SBx31XZ4 XFP Line Card
Perform the following procedure to install the AT-SBx31XZ4 Line Card
:
Caution
The AT-SBx31XZ4 XFP Line Card contains active electronic
devices, which can be damaged by electro-static discharges (ESD).
Follow the procedure given in “Protection Against Electrostatic
Discharge (ESD)” on page 60 to guard against ESD damage when
unpacking and installing this line card.
devices, which can be damaged by electro-static discharges (ESD).
Follow the procedure given in “Protection Against Electrostatic
Discharge (ESD)” on page 60 to guard against ESD damage when
unpacking and installing this line card.
1. Choose a slot in the chassis for the AT-SBx31XZ4 Line Card. The line
card can be installed in slots 0 to 3 or 6 to11.
Note
Chassis slots 4 and 5 are reserved for the AT-SBx31CFC Fabric
Control Card.
Control Card.
2. Remove the line card from the shipping package. If this item is missing
or damaged, contact your Allied Telesis sales representative for
assistance.
assistance.
Note
Store the packaging material in a safe location. You may use the
original shipping material if you need to return the unit to Allied
Telesis.
original shipping material if you need to return the unit to Allied
Telesis.
3. Align the AT-SBx31XZ4 with the internal chassis card guides in the
selected slot of the AT-SBx3112 Chassis. Figure 46 on page 73 shows
the line card being aligned in slot 4. Figure 49 shows the line card
being aligned with slot 7.
the line card being aligned in slot 4. Figure 49 shows the line card
being aligned with slot 7.
ESD
POWER
3
5
7
9
11
RS-232
1831
SBx31XZ4
0
1
2
3
XFP
XFP
XFP
XFP
10G LINK /
ACT
POR
T ACTIVI
TY