Allied Telesis AT-SBX3165 User Manual

Page of 104
SwitchBlade x3112 Installation Guide
65
Installing the AT-SBx3165 PoE Power Supply
To install the AT-SBx3165 PoE Power Supply, perform the following 
procedure:
1. Choose a slot in the chassis for the AT-SBx3165 PoE Power Supply. 
You can install the power supply in either slot A or B. 
2. If you want to install the power supply in slot A, remove the blank 
power supply panel by lifting the blank panel handle and lifting the 
panel out of the slot.
Warning
The AT-SBx3165 PoE Power Supply contains active electronic 
devices, which can be damaged by electro-static discharges (ESD). 
Follow the procedure given in “Protection Against Electrostatic 
Discharge (ESD)” on page 60 t
o guard against ESD damage when 
unpacking and installing these power supplies.
3. Remove the power supply from the shipping package.
Note
Store the packaging material in a safe location. You may use the 
original shipping material if you need to return the unit to Allied 
Telesis.
4. Ensure that the following hardware components are included in your 
package:
– One AT-SBx3165 PoE Power Supply 
– One AC power cord
If one of these items is missing or damaged, contact your Allied Telesis 
sales representative for assistance.
5. Move the locking handle on the AT-SBx3165 to the unlocked or up