Allied Telesis AT-SBX3165 User Manual

Page of 104
SwitchBlade x3112 Installation Guide
83
Installing the Chassis Blank Panels
Ten blank panels are supplied with the AT-SBx3112 Chassis. These 
panels must be installed in to insure proper airflow through out the 
chassis. To install the blank panels, perform the following procedure:
1. Install a blank panel in each vacant slot from slots 0 to 11 where a line 
card has not been installed.
2. Align the two thumb screws on the blank panel with the mounting holes 
on the front panel rails of the chassis.
3. Finger tighten the two thumbscrews to attach the blank panel to the 
chassis.
4. With a # 2 Phillips head screw driver, torque both thumbscrews to 
 
.56 Nm (5 lb-in) maximum.
5. Repeat steps 2 through 4 for the remaining vacant slots.
6. Store any unused blank panels in a secure place for future use.