Chapter 2: Installation
30
Site
Requirements
The device should be placed on a table-top. Before installing the unit, verify that the 
location chosen for installation meets the following site requirements.
ˆ
General — Ensure that the power supply is correctly installed.
ˆ
Power — The unit is installed within 1.5 m (5 feet) of a grounded, 
easily accessible outlet 100-250V AC, 50-60Hz.
ˆ
Clearance — There is adequate frontal clearance for operator access. 
Allow clearance for cabling, power connections, and ventilation.
ˆ
Cabling — The cabling is routed to avoid sources of electrical noise 
such as radio transmitters, broadcast amplifiers, power lines, and 
fluorescent lighting fixtures.
ˆ
Ambient Requirements — The ambient unit operating temperature 
range is 0 to 40ºC (32 to 104ºF) at a relative humidity of up to 95%, 
non-condensing. Verify that water or moisture cannot enter the device 
casing.
Unpacking
This section contains information for unpacking the device, and includes the following 
topics:
ˆ
ˆ
ˆ
Package Contents
While unpacking the device, ensure that the following items are included:
ˆ
One AT- AT-8000/xx series unit
ˆ
Rubber Feet for desktop installation
ˆ
Rack-mount kit hardware accessories
ˆ
An AC power cable
ˆ
Stacking cable (Yellow color)
ˆ
Console RS-232 cable with RJ-45 connector
ˆ
Installation guide on CD
Warranty 
The AT-AT-8000 series switches have a Lifetime Warranty (two years for Fan and PSU). 
Go to www.alliedtelesis.com/warranty for the specific terms and conditions of the warranty 
and for warranty registration.
Unpacking Essentials
Note
Before unpacking the device, inspect the package and report any evidence of 
damage immediately.