DELL CX4 User Manual

Page of 68
Cabling Your Cluster Hardware
21
Cabling a Cluster to a Dell/EMC Storage System
Each cluster node attaches to the storage system using two Fibre optic cables 
with duplex local connector (LC) multimode connectors that attach to the 
HBA ports in the cluster nodes and the storage processor (SP) ports in the 
Dell/EMC storage system. These connectors consist of two individual Fibre 
optic connectors with indexed tabs that must be aligned properly into the 
HBA ports and SP ports.
 
CAUTION: 
Do not remove the connector covers until you are ready to insert the 
connectors into the HBA port, SP port, or tape library port. 
Cabling a Two-Node Cluster to a Dell/EMC Storage System
 
NOTE: 
The Dell/EMC storage system requires at least 2 front-end fibre channel 
ports available on each storage processor.
1 Connect cluster node 1 to the storage system:
a
Install a cable from cluster node 1 HBA port 0 to the first front-end 
fibre channel port on SP-A.
b
Install a cable from cluster node 1 HBA port 1 to the first front-end 
fibre channel port on SP-B.
2 Connect cluster node 2 to the storage system:
a
Install a cable from cluster node 2 HBA port 0 to the second front-end 
fibre channel port on SP-A.
b
Install a cable from cluster node 2 HBA port 1 to the second front-end 
fibre channel port on SP-B.