IBM Type 8730 User Manual

Page of 180
(see
 
the
 
documentation
 
that
 
comes
 
with
 
your
 
blade
 
server
 
for
 
information
 
about
 
turning
 
on
 
the
 
blade
 
server).
 
Make
 
sure
 
that
 
you
 
shut
 
down
 
the
 
blade-server
 
operating
 
system
 
before
 
turning
 
off
 
a
 
blade
 
server,
 
to
 
avoid
 
damaging
 
the
 
hard
 
disk
 
drives.
 
Notes:
  
1.
   
Within
 
two
 
minutes
 
after
 
power
 
has
 
been
 
connected
 
to
 
the
 
BladeCenter
 
T
 
unit,
 
the
 
management
 
module
 
applies
 
power
 
to
 
the
 
I/O
 
modules.
 
2.
   
If
 
a
 
power
 
failure
 
occurs,
 
the
 
BladeCenter
 
T
 
unit
 
restarts
 
automatically
 
when
 
power
 
is
 
restored.
 
3.
   
The
 
blade-server
 
power
 
button
 
turns
 
on
 
or
 
turns
 
off
 
the
 
blade
 
server
 
if
 
local
 
power
 
control
 
has
 
not
 
been
 
disabled
 
through
 
the
 
management
 
module.
 
4.
   
The
 
blade-server
 
power
 
button
 
turns
 
on
 
the
 
blade
 
server
 
only
 
if
 
the
 
green
 
power
 
light
 
on
 
the
 
blade
 
server
 
is
 
flashing
 
slowly.
 
If
 
the
 
light
 
flashes
 
rapidly,
 
the
 
blade
 
server
 
has
 
not
 
yet
 
synchronized
 
with
 
the
 
management
 
module
 
and
 
pressing
 
the
 
power
 
button
 
will
 
have
 
no
 
effect.
Type
 
8730
 
(ac
 
power)
 
The
 
BladeCenter
 
T
 
unit
 
can
 
support
 
two
 
or
 
four
 
power
 
modules.
 
The
 
BladeCenter
 
T
 
unit
 
does
 
not
 
have
 
a
 
power
 
switch.
 
To
 
start
 
the
 
BladeCenter
 
T
 
Type
 
8730
 
(ac
 
power)
 
unit,
 
connect
 
one
 
end
 
of
 
a
 
power
 
cord
 
into
 
input
 
power
 
connector
 
1
 
and
 
2
 
on
 
the
 
rear
 
of
 
the
 
BladeCenter
 
T
 
unit,
 
and
 
the
 
other
 
end
 
of
 
each
 
power
 
cord
 
into
 
a
 
220-volt
 
power
 
distribution
 
unit
 
(PDU)
 
that
 
is
 
connected
 
into
 
an
 
appropriate
 
electrical
 
outlet.
 
There
 
are
 
four
 
IEC320
 
power
 
connectors
 
on
 
the
 
rear
 
of
 
the
 
Type
 
8730
 
(ac
 
power)
 
unit,
 
marked
 
1-4
 
on
 
the
 
rear
 
panel.
 
Power
 
is
 
applied
 
to
 
the
 
respective
 
power
 
module
 
according
 
to
 
the
 
numbering
 
convention
 
on
 
the
 
rear
 
panel.
 
v
   
Power
 
connector
 
1
 
supplies
 
power
 
to
 
power
 
module
 
1
 
v
   
Power
 
connector
 
2
 
supplies
 
power
 
to
 
power
 
module
 
2
 
v
   
Power
 
connector
 
3
 
supplies
 
power
 
to
 
power
 
module
 
3
 
v
   
Power
 
connector
 
4
 
supplies
 
power
 
to
 
power
 
module
 
4
System
 
reliability
 
considerations
 
To
 
help
 
ensure
 
proper
 
cooling
 
and
 
system
 
reliability,
 
make
 
sure
 
that:
 
v
   
Each
 
of
 
the
 
module
 
bays
 
on
 
the
 
front
 
and
 
rear
 
of
 
the
 
BladeCenter
 
T
 
unit
 
has
 
either
 
a
 
module
 
or
 
filler
 
module
 
installed.
 
v
   
Each
 
of
 
the
 
blade
 
bays
 
on
 
the
 
front
 
of
 
the
 
BladeCenter
 
T
 
unit
 
has
 
either
 
a
 
blade
 
server
 
or
 
filler
 
blade
 
installed.
 
v
   
Each
 
of
 
the
 
drive
 
bays
 
in
 
a
 
blade
 
server
 
storage
 
expansion
 
option
 
has
 
either
 
a
 
hot-swap
 
drive
 
or
 
a
 
filler
 
panel
 
installed.
 
v
   
Each
 
of
 
the
 
PCI
 
slots
 
in
 
a
 
blade
 
server
 
PCI
 
I/O
 
expansion
 
option
 
has
 
either
 
a
 
PCI
 
adapter
 
or
 
a
 
PCI
 
filler
 
bracket
 
installed
 
v
   
A
 
removed
 
hot-swap
 
module
 
or
 
drive
 
is
 
replaced
 
within
 
1
 
minute
 
of
 
removal.
 
v
   
A
 
removed
 
hot-swap
 
blade
 
is
 
replaced
 
within
 
20
 
minutes
 
of
 
removal.
 
v
   
A
 
failed
 
blower
 
is
 
replaced
 
as
 
soon
 
as
 
possible,
 
to
 
restore
 
cooling
 
redundancy.
 
Chapter
 
4.
 
Setting
 
up
 
the
 
BladeCenter
 
T
 
hardware
 
39