Gateway E-9722R User Manual

Page of 112
www.gateway.com
47
10
Holding the new backplane by the edges only, align it with the locking tabs on the backplane 
bracket, then place it on the locking tabs (1) and slide it to the right until it click into place.
11
Insert the backplane assembly into the chassis (2), then press down on the assembly until 
the locking tabs on the chassis engage the holes on the right and left sides of the bracket.
12
Reconnect all cables to the backplane.
13
Replace the system fans and fan cage, and the fan duct by following the instructions in 
14
Follow the instructions in 
15
Reinstall the hot-swap drives back into the server. Make sure that you install the drives 
into the same bays you removed them from in 
. For instructions see 
16
Replace the bezel by snapping it into place on the front of the server.
Installing and removing an optional mezzanine 
board
This server has two types of optional mezzanine boards. They include a 2-channel SAS mezzanine 
board, and 2-channel SAS mezzanine board with RAID. They are designed to provide extra HDD 
storage capability with one 160-pin mezzanine board connector. Each type of mezzanine board 
uses the specific chipset for optimal features and provides expansive storage by connecting with 
the extra drives.