Fujitsu BX600 S2 User Manual

Page of 173
108
 
 
PRIMERGY BX600 S2 Basic Unit
Port Assignment
FC Switch Blade
©
 c
o
g
n
it
as
Ge
s
e
lls
c
h
ft
 f
ü
r T
e
c
h
n
ik
-Do
k
u
m
e
nt
at
io
n
 m
b
2
007
 
P
fad:
 H:
\w
in
dows
\_p
roj
e
k
te\
B
x
z
\B
e
tr
ie
b
s
a
n
le
it
un
g\
V
e
rs
ion_
M
a
e
rz
-2
007
\A
rc
h
iv
\B
X
6
0
0
S
2
_
en\
bl
ad
e-u
s
.k
0
9
10.2
Port Assignment
Connections to the two fabric ports of the optional fibre channel daughter card 
are provided for each of the ten server blade slots. In the case of 4-way server 
blades, connections for a total of four fabric ports are therefore available.
The FC switch blade in the NET3 slot is connected to port A of the installed fibre 
channel daughter cards. The FC switch blade in the NET4 slot is connected to 
port B of the installed fibre channel daughter cards.
Figure 60: Slots for FC switch blades
The installation of two FC switch blades enables redundant fibre channel 
connections to be provided for the server blades.
V
CAUTION
FC switch blades must always be installed in slot NET3 first. This 
ensures that port A of the FC daughter cards is connected if 
redundant fibre channel connections are not used.
If Gigabit Ethernet daughter cards are installed in the server blades, 
LAN switch blades (see 
) or Ethernet pass-thru blades (see 
) must be installed in slots NET3 and NET4.
Simultaneous operation of Ethernet blades and fibre channel blades 
in slots NET3 and NET4 is not permitted.
The configuration examples below show the assignment of the FC daughter 
card ports to the LAN switch blades in slots NET3 and NET4.
NET4
NET3