Fujitsu N800 User Manual

Page of 142
20
 
 U41243-J-Z156-1-76
Mounting the server in the rack
Installing the server
3.2
Mounting the server in the rack
V
CAUTION!
Please take note of the safety information and the notes on mounting 
in the rack in the chapter “Important notes” on page 11.
At least two people are needed to position the server in the rack.
The rack may tip over if more than one heavy unit is removed.
Mounting the installation kit and the server
For mounting the server in the DataCenter Rack at first a support bracket must 
be mounted on the rear left support upright. The support bracket must be 
mounted level with the lower edge of the server. Cage nuts and/or spring nuts 
also must be inserted in the support uprights. The support bracket is used for 
the rear fixing of the left carrier rail, the cage nuts are used for fixing the support 
bracket and the front panel, the spring nuts for fixing the carrier rails:
Ê
Take the fitting instruction in the Technical Manual for the corresponding rack 
model for aid.
Ê
Using the mounting aid (stencil) mark the position of the attachment points 
of the server on the support uprights (7 height units).
Refer to the information on the mounting aid.
Ê
Mount the support bracket using two screws and cage nuts on the corre-
sponding height on the rear left support upright. 
Ê
If required, you can mount one additional a cable clip for vertical cable 
routing.
Ê
Mark the mounting points of the server (knurled screws on the front panel) 
on the front support upright. Also mark the fastening points of the telescopic 
rails on the inside grooves of the support uprights facing backwards. The 
bottom edge of the fastening flange must be flush with the top housing cover 
of any device already mounted.
Ê
Place the cage nuts and/or the spring nuts in the groove of the support 
uprights and/or of the support bracket at the marked attachment points. If 
necessary, adjust the position of the nuts in the groove until they lock into 
the correct position.