Fujitsu N800 User Manual

Page of 142
U41243-J-Z156-1-76
 31
Installing the server
Connecting the server to line voltage
RemoteView (RTDS), SEMAN and the CAN bus
The update of the firmware and the testing and diagnosis of the storage 
subsystem can only be performed via the CAN bus and using SEMAN (included 
on the ServerStart CD) or the optional RemoteView (remote test and 
diagnostics system). Refer to the RemoteView manual for more information 
(see “Related publications” on page 125).
3.6
Connecting the server to line voltage
The server is equipped with a modular, hot-plug power supply consisting of a 
maximum of three power supply units. A redundant power supply can be set up 
with a third power supply unit. If a defect occurs in one unit, the other unit 
ensures unimpaired further operation. The defective unit can be replaced during 
operation.
The power supply units automatically adjust to a voltage range from 100V to 
120V or 200V to 240V.
Ê
Plug the server’s power cord into the insulated socket on the server (see 
figure 13 on page 36) and into a free socket on the connector strip on the 
rack (see the technical manual for the rack).