Cabling and connecting — Basic rules, specifications for connecting 
lugs, torque values for bolted lug to bus bar connections, cabling layouts, 
and procedures for cabling and connecting the ground leads, AC supplies 
for the rectifiers, DC load cables, miscellaneous cables, and final 
connections at the batteries.
4
Startup and adjustment procedures — Installation of the rectifiers in the 
power shelves and initial startup, testing, and adjustment of the power 
system. Candeo SP 48300 power systems make use of a 
microprocessor-based controller, which controls the settings for the 
rectifiers. There are no hardware-based adjustments for the System 
Manager SP, but there are other configuration steps required. Refer to the 
chapter “Configuring and operating the system” in the user manual 
(P7000154). 
5
End of job routines and turnover — End-of-job routines include 
designating frame numbers, rectifiers, and distribution circuits, and 
touching up damaged and/or scratched painted surfaces, then turning 
over the system to the customer.
Configuration reference guide
The Candeo system is easy to configure. For detailed instructions, refer to 
Candeo Power System User manual UC6C75 (P0914425) for the Large 
Candeo system, or Candeo SP 48300 Power System AP6C55AA User Manual 
(P7000154) for the Small Candeo system. The installation manuals cover the 
following topics.
Large Candeo
1
Overview of the Candeo Power System
2
System Description and Specifications
3
System Engineering
4
Configuring and Operating the Candeo Power System
5
Maintenance
6
Troubleshooting
7