 Installing earthquake bracing
NN43021-310
Standard 02.01
December 2007
3
Loosely install the pedestal mounting hardware (1/2 in. bolts, lock 
washer, plain washer, and insulating washer), using the plastic insulating 
washers.
4
Re-level the column, adding or removing shims as needed. Go back and 
re-level any other columns.
5
Repeat the above steps until all columns have been positioned.
6
Slide shims completely under seismic plates. First tighten the pedestal 
mounting bolts, torque to 122 J (90 ft-lb). Then, tighten the concrete 
anchors, torque to 48 J (35 ft-lb).
End of Procedure
Installing non-seismic bracing
In certain applications where earthquakes do not occur, the pedestal 
attachment to the floor does not have to meet Bellcore or California OSHPD 
requirements. This application could include attachment to a raised wood or 
steel floor using the kits described below. 
Installing non-seismic bracing involves:
1
2
Selecting the kit
If the installation does not have to meet the Bellcore or OSHPD requirements, 
the installer can design and install an attachment suitable for the particular 
installation using: 
NT8D64BF Floor Mounting Kit
NT8D6401 Insulating Washer Kit