Adding or Removing Cabinet Hardware 
6-87
Add a Control Carrier (Add Duplication) 
6
6. Connect the 8 ground straps from the “A” carrier to the new “B” carrier 
(See 
). These straps were left connected to the “A” carrier 
when the old “B” carrier was removed.
7. For a standard AC-powered control carrier, install the 4 carrier ground 
straps. The straps connect ground points G1 and G8 from the top of the 
B-carrier backplane to the B-carrier connector panel bracket and ground 
points G9 and G16 from the bottom of the B-carrier backplane to the 
B-carrier connector panel  bracket. 
For an enhanced carrier, install the 16 carrier-ground straps. The straps 
connect ground points G1 through G8 from the top of the B-carrier 
backplane to the B-carrier connector panel  and ground points G9 through 
G16 from the bottom of the B-carrier backplane to the B-carrier connector 
panel . Use the 8 screws to connect the ground straps to the connector 
panel  (see 
NOTE:
An enhanced carrier is used only in an R8r PPN cabinet that uses 
either AC power (U.S.) or Global power.
NOTE:
DC-powered cabinets DO NOT use any of the above carrier-ground 
straps.