NCR 7870 User Manual

Page of 228
Chapter 3:  Site Preparation
For the NCR 7870 to operate efficiently and safely, the selected
installation site must meet certain requirements.  Ensuring that these
conditions are met and maintained will protect the 7870 from
unnecessary wear and potential damage as well as easing installation.
This chapter covers
 
Getting Started
 
About Site Preparation
 
Customer Responsibilities
 
Environmental Requirements
 
Checkstand Power and Wiring Considerations
 
Checkstand Considerations
 
Cable Lengths and Hole Sizes
 
7870 Dimensions