Whirlpool UXT3030AY User Manual

Page of 28
9
2. Lift the range hood up under cabinet and determine final 
location by centering beneath cabinet. Mark on the underside 
of cabinet the location of the 4 keyhole mounting slots on the 
range hood. Set range hood aside on a covered surface.
3. Use 
¹⁄₈" (3 mm) drill bit and drill 4 pilot holes as shown.
4. Install the 4 - 4.5 mm x 13 mm mounting screws in pilot 
holes. Leave about 
¹⁄₄" (6.4 mm) space between screw heads 
and cabinet to slide range hood into place.
5. For roof installations, remove the top rectangular vent 
knockout. For wall installations, remove the rear rectangular 
vent knockout.
6. Install the 3¼" x 10" (8.3 x 25.4 cm) vent connector. Attach to 
range hood with the 3.5 x 9.5 mm screws provided and 
remove tape from damper flap.
NOTE: The 3
¹⁄₄" x 10" (8.3 x 25.4 cm) rectangular vent 
connector can be installed up to 1" (2.5 cm) on either side 
of the hood center to accommodate off center ductwork.
If a vent damper is installed with a wall cap with damper, 
check that they do not interfere with each other. Remove 
the vent connector damper flap if they interfere.
Power Supply Cable Installation
1. For direct wire installations, run the home power supply cable 
according to the National Electric Code or CSA standards 
and local codes and ordinances. There must be enough 
wiring from the fused disconnect (or circuit breaker) box to 
make the connection in the hood electrical terminal box.
For optional power supply cord kit installations, follow the 
instructions in the “Make Electrical Connections” section.
NOTE: Do not reconnect power until the installation is 
complete.
2. Remove the screw from the terminal box cover. Remove 
terminal box cover and set aside. 
A. Keyhole slot
A. Drill pilot hole
A. Top rectangular vent knockout
B. Rear rectangular vent knockout
A
A
¹⁄₄
"
(6.4 mm)
A
B
A. Vertical connector
B. 3.5 x 9.5 mm screws
C. Vent knockouts
D. Horizontal connector
A. Terminal box cover
B. Screw
B
A
B
D
C
A
B