Grizzly 60773 User Manual

Page of 104
Model G0773 (Mfd. Since 12/14)
-17-
SECTION 3: SETUP
Your  machine  was  carefully  packaged  for  safe 
transportation.  Remove  the  packaging  materials 
from  around  your  machine  and  inspect  it.  If  you 
discover any damage, please call us immediately 
at (570) 546-9663
 for advice. 
Save the containers and all packing materials for 
possible  inspection  by  the  carrier  or  its  agent. 
Otherwise, filing a freight claim can be difficult.
When you are completely satisfied with the condi-
tion of your shipment, inventory the contents.
Unpacking
The list below outlines the basic process of setting 
up  the  machine  for  first-time  operation.  Specific 
steps are covered later in this section.
The typical setup process is as follows:
1.  Unpack  machine  and  inventory  contents  of 
box/crate.
2.  Clean machine and its components.
3.  Move  machine  to  an  acceptable  location, 
level bedways, and secure in place.
4.  Assemble machine and make sure it is ready 
for operation.
5.  Connect machine to power source.
6.  Test run machine and various safety compo-
nents to ensure they function properly.
7.  Perform  spindle  break-in  procedure  to  pre-
pare spindle bearings for operational loads.
Setup Overview
SUFFOCATION HAZARD!
Keep children and pets away 
from plastic bags or packing 
materials shipped with this 
machine. Discard immediately.
The  following  are  needed  to  complete  the  setup 
process, but are not included with your machine.
Description 
• 
Another Person for Moving Machine
• 
Safety Glasses
• 
Cleaner/Degreaser (
Page 19)
• 
Quality Metal Protectant
• 
Disposable Shop Rags
• 
Forklift
• 
Lifting Slings (rated for at least 700 lbs.)
• 
Mounting Hardware (
Page 22)
Needed for Setup