Southbend SB1012 User Manual

Page of 144
For Machines Mfg. Since 7/09
EVS Toolroom Lathes
-9-
P R E P A R A T I O N
Inventory
Main Inventory 1: (Figure 
2
) Qty
A.
  Steady Rest Assembly .................................... 1
B.
  12" Faceplate w/D1-6 Camlock Stud Set ...... 1
C.
   10" Four-Jaw Chuck w/Combo Jaws ............. 1
D.
  Four-Jaw Chuck Key ..................................... 1
E.
   Four-Jaw Chuck D1-6 Camlock Stud Set ..... 1
F.
 
Follow Rest Assembly .................................... 1
Tool Box Inventory: (Figure 
3
) Qty
G.
 Tool 
Box 
.......................................................... 1
H.
  Three-Jaw Chuck Key ................................... 1
I.
 
Tool Post T-Wrench ........................................ 1
J.
 
Hex Wrench Set 1.5-10mm ............................ 1
K.
  Dead Center MT#4 ......................................... 1
L.
  Carbide-Tipped Dead Center MT#4 .............. 1
M.
  Tapered Spindle Sleeve MT#6-#4 ................. 1
N.
  Open End Wrench 22/24mm ......................... 1
O.
  Open End Wrench 14/17mm ......................... 1
P.
  Open End Wrench 10/12mm ......................... 1
Q.
  Phillips Screwdriver #2 ................................. 1
R.
  Standard Screwdriver #2 ............................... 1
S.
  9"-Chuck Jaws (SB1014-15, SB1037-38) ...... 3
 
8"-Chuck Jaws (SB1012-13) .......................... 3
T.
 
Cast Iron Leveling Pads ................................ 8
U.
 Handwheel 
Handles 
....................................... 2
Note:
 Some inventory components may be 
shipped inside of the lathe electrical box. These 
items MUST be removed before connecting the 
lathe to the power source.
Figure 2. Main inventory.
Figure 3. Toolbox inventory. 
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U