Woodstock M1044 User Manual

Page of 24
-9-
M1044 52" Foot Shear
SE
U
P
We recommend that you mount your new foot shear to 
the floor for safety and to offer the best performance. 
Since floor materials vary, floor mounting hardware is 
not included. Generally, you can bolt your foot shear to 
the floor using the options described below. Whichever 
option you choose it will be necessary to use a precision 
level to level your foot shear.
Bolting to Concrete Floors
Lag shield anchors with lag bolts (
Figure 3) and anchor 
studs (
Figure 4) are two popular methods for anchoring 
an object to a concrete floor. We suggest you research 
the many options and methods for mounting your foot 
shear and choose the best that fits your specific applica-
tion.
Mounting to Shop Floor
Figure 3. Typical lag shield anchor and lag 
bolt.
Figure 4. Typical anchor stud.
NOTICE
Anchor studs are stronger and more permanent alter-
natives to lag shield anchors; however, they will stick 
out of the floor, which may cause a tripping hazard if 
you decide to move your machine at a later point. 
Lifting Shear
A forklift or other mechanical device will be needed to 
lift the 1040 lb. shear off of the pallet. Have a helper 
nearby to assist. Lift the foot shear as shown in
 Figure 2.
Figure 2. Lifting the foot shear.