Southbend SB1025 User Manual

Page of 100
For Machines Mfg. Since 8/09
SB1024/SB1025/SB1026
-49-
M A I N T E N A N C E
Maintenance Schedule
Each operator of this machine is responsible 
for ensuring proper care of the equipment. We 
strongly recommend that all operators make 
a habit of following the daily maintenance 
procedures.
For optimum performance from this machine, 
this maintenance schedule must be strictly 
followed. Use the Monthly Maintenance Chart 
on Page 50 to ensure this is done.
Ongoing
To maintain a low risk of injury and proper 
machine operation, if you ever observe any of the 
items below shut the machine down immediately, 
disconnect it from power, and fix the problem 
before continuing operations.
s
,OOSE
s
7ORN
s
%MERGENCY
s
-ISSING
s
2EDUCTION
s
#OOLANT
s
!NY
Always disconnect 
machine from power before 
performing maintenance or 
serious personal injury may 
result.
!
Before Beginning Operations
s
-AKE
s
4URN
s
-OVE
s
-AKE
s
#HECK
s
0ERFORM
s
#HECK
Daily, After Operations
s
0USH
s
6ACUUMCLEAN
s
7IPE