Bosch SHU53 User Manual
![Bosch](https://files.manualsbrain.com/attachments/992db0bc6e4e397e226301d2fb6c3619baa82b37/common/fit/150/50/58e0935709337019a05abb2f9dc9475495d1a6775066eb5a72dc939185f4/brand_logo.png)
ENGLISH - 3
ENGLISH
www.boschappliances.com
TOOLS & MATERIALS NEEDED
Tools Needed for Installation
Additional materials may be required to comply with local codes.
Figure 2
Materials Needed
Hot Water Supply Line - Minimum 3/8”
O.D. copper tubing or metal braided
dishwasher supply line.
O.D. copper tubing or metal braided
dishwasher supply line.
Shut-off valve and fittings for hot water
supply line.
supply line.
90° elbow with 3/8” N.P.T. external threads
on one end and sized to fit your water
supply line on the other end.
on one end and sized to fit your water
supply line on the other end.
UL listed conduit connector or strain relief.
3 twist-on wire connectors for 16 AWG
wire.
wire.
Teflon tape or other pipe thread compound
which help seal plumbing connections.
which help seal plumbing connections.
Electric Connection - 2 conductor, 1 ground
insulated electrical supply cable (30” or
sufficient length for
insulated electrical supply cable (30” or
sufficient length for
your installation).
Figure 1
! "
#$% &%
'
' (
"
&%
)
*
+
$$