Bosch SHV56A User Manual

Page of 19
ENGLISH - 15
ENGLISH
www.boschappliances.com
SHY66 & SHX56 Series Base and Toe Panel Installation
Steps
BASE AND TOE PANEL
Assembly Steps
Place J-Box Cover on J-Box, insert
and tighten screw (Figure 26).
Drop screws inside holes in base part.
Slip Base Part under and up front
bottom panel of dishwasher. Tighten
Base Part Screws - LOW TORQUE,
USE HAND TOOL ONLY.
Slip Cotton Insulation Strip under
unit, between the bottom of Base
Part and the floor.
Installation Parts
SHY66 & SHX56 Base Part
Base Part Screws
SHY66 & SHX56 Toe Panel
SHU Toe Panel Screws
SHY66 & SHX56 Installation Kit
(Refer to “Materials Supplied” section)
Remember to carefully check, the “Materials
Supplied” section against the Installation Kit
bag and contents.
Disassembly Steps
Pull Toe Panel off (Figure 25).
Loosen Screws
LOW TORQUE, USE HAND TOOL
ONLY.
Remove Base Part by pulling it out
and downward.
Junction Box Cover is required
for any installation application
After installation, water and electrical
lines are connected and the unit leveled,
assemble the base part (see below).
Figure 26
Figure 24
Figure 25
   
  
   
  
   
   
 !"   
SHY66 & SHX56 BASE PARTS