Panasonic KY-B64CA User Manual

Page of 52
49
Upon completing installation, check and mark off the following items.
I hereby certify that installation has been completed.
 
Signature of installer
Checklist
Checked
Appearance  
Ensure that the appliance is not tilted.
 
Is the top plate clean?
Electrical 
work
 
Is the power supply a single-phase (220-240 V ~), or 
a three-phase (380-415 V 2N~)?
 
Has the earth been installed?
 
Has the earth leakage circuit breaker been installed?
Electrical 
testing
1. Touch 
 to turn on the main power.
 
Does the main power light illuminate?
2. Touch the following keys to check function of 
each IH heater:
 
Left front cooking zone
 
Left rear cooking zone
 
Right front cooking zone
 
Right rear cooking zone
 
Make sure to turn off each cooking zone and the main power switch after 
performing electrical testing.
 
Hand the Operating Instructions / Installation Instructions to the customer.
Does “-” flash?
Post-installation Checklist