DCS CS-364G User Manual

Page of 26
STEP 3:
(CONTINUED)
6) Cut the openings for the following installation:
Standard counter top installation, see Fig. 5A
Deep counter or island installation, see Fig. 5B
NOTE: If the deck is used, the sides or  bottom of
the cutout may be solid combustible or 
non-combustible material. If the bottom 
is solid, provide a 6" x 6" cutout in the 
left rear corner for the gas inlet and 
power cord clearance.
CABINET PREPARATION
9
Flush with cabinets
Front projects outward as shown 
from standard depth cabinet.
Front flush with cabinets; a minimum 
of 25 
3/4"
 cabinet depth required
Fig. 2
Front flush with cabinets; a minimum of 
25 3/4” cabinet depth required
Front projects outward as shown 
from standard depth cabinet.
Flush with cabinets
Counter-Sunk Screws
Fig. 3
Counter-Sunk Screws