Pasquini Espresso Company GH-LUX User Manual
INSTALLATION
AND PREPARATION FOR DAILY USE
1. Remove
LIVIETTA T2 ESPRESSO MACHINE from shipping box.
2. Plug
Power Cord (9) into electrical socket. Only plug into a grounded
3 prong 120vaC outlet.
3. Lift lid of
Water Reservoir (6) and fill with water (calcium free).
4. Push
Power Switch (1) to “On”. Indicator (3) Light will luminate
when ready to brew (approximately 2 1/2 minutes).
5.
Indicator (4) light will luminate when ready to steam.
6. Push
Steam Switch (2) for steam.
note
:
a couple of seconds delay is normal before steam comes out.
7. heat
Portafilter (8) before filling with coffee for first usage of the day
by doing the following:
a.
engage empty
Portafilter with either Double Cup Filter
or
Single Cup Filter into Group (7).
b.
Switch “On”
Pump Switch (5) allowing hot water to flow through
Portafilter for approximately 10 seconds, then switch “Off”.
8. If the machine is moved, it may be necessary to prime immediately after
switching machine “On”. Prime machine by pushing
Pump Switch (5)
“On” until water flows from
Brewing Group (7), then “Off”.
LIVIETTA
T2
CALL OUT
1
6
3
5
4
7
10
8
1 1
12
9
2
ACCESSORIES
• Optional “Pod adapter” available. (see page 9)
• Optional “auto foamer” available. (ask for details)
• Optional “auto foamer” available. (ask for details)
1. Power Switch - On/Off
2. Steam Switch
3. brew Ready Light
4. Steam Ready Light
5. Pump Switch
2. Steam Switch
3. brew Ready Light
4. Steam Ready Light
5. Pump Switch
- push to brew coffee
6. Removable water
Reservoir
• Measuring Spoon
• black Rubber Cleaning Disc
• Pressor
7. brewing group
8. Portafilter
9. Power Cord
10. Steam Jet
11. Defuser
12. Drain basin & Tray
8. Portafilter
9. Power Cord
10. Steam Jet
11. Defuser
12. Drain basin & Tray
• Double Cup filter
• Single Cup filter
• Pitcher
4
5