Sterling 238 User Manual

Page of 43
Powder Hopper Loaders 
Page 11 
 
2 Safety 
2-1  Work Rules 
Install, operate, and maintain this equipment according to 
applicable work and safety codes for your location.  This includes 
OSHA, CE, NEC, CSA, SPI, and many other local, national, and 
international regulations.  Obey these specific work rules: 
  Read and follow the instructions in this manual before 
installing, operating, or maintaining any equipment.  
Additional copies are available from the manufacturer. 
 
  Only qualified persons should work on, or with, this equipment. 
 
  Work only with approved tools and devices. 
 
  Disconnect and lock out power while working on this 
equipment. 
 
2-2   Tools and Equipment Needed 
You’ll need the following: 
 
•  Hand tools 
•  Fork lift or overhead lift 
•  Wire, conduit, and fittings for wiring runs (if receptacle is not 
already in place) 
•  Mounting bolts with lock nuts and washers, or pop rivets  
•  Compressed air tubing and fittings