American Panel AP40BC250-12 User Manual

Page of 42
 
 
 
 
Thank you, and congratulations on your purchase of an American Panel blast chiller. We take great 
pride in engineering and manufacturing each of our products. With the goal of providing the highest 
accuracy and quality possible, our state-of-the-art manufacturing and quality control facility enables 
us to continually explore new technologies so that we can provide you with the finest equipment in the 
industry. 
 
Because of our commitment to your satisfaction, we have developed this Installation, Operation, and 
Maintenance manual to guide you through the complete installation process, and to help you maintain 
your equipment properly. Familiarization and compliance with this manual will ensure you years of 
trouble-free operation. 
 
On occasion situations can arise and will require the help of the factory, whether it be technical 
information, service or replacement of parts. We have a highly trained Customer Service and Parts 
Department available to help when these situations arise. We also offer a national network of service 
agencies that may be contacted for warranty and out-of-warranty service. 
 
When contacting the factory, please refer to the equipment serial number which can be located on the 
identification plate positioned on the side of the control panel.  
  
Thank you once again for your purchase of American Panel equipment. 
 
 
 
“Our reputation rests on the steadfast pursuit of your satisfaction”. 
 
 
 
 
 
    
               
 
 
 
American Panel Corporation 
5800 S.E. 78 th Street, Ocala, Florida 34472-3412 
Phone: (352) 245-7055 Fax: (352) 245-0726  
E-mail: