Hoshizaki SRH/3 User Manual

Page of 101
54
B. Component Service Information
NOTICE
When replacing a component listed below, see the notes to help ensure proper 
operation.
Component
Notes
Compressor
1 phase: Install a new start capacitor, run capacitor, and start relay.
3 phase: Install a new magnetic contactor.
Thermostatic 
Expansion Valves
• Attach the thermostatic expansion valve bulb to the suction line in the same location as 
the previous bulb. 
• The bulb should be between the 10 and 2 o'clock positions on the tube. 
• Secure the bulb with the clamp and holder, then insulate it.
Hot Gas Valves
Liquid Line Valves
• Replace the strainer if applicable.
• Use copper tube of the same diameter and length when replacing valve lines.
Fan Motors
Install a new capacitor.
Pump Motor
Install a new capacitor.
Thermistor
• Attach the new thermistor to the suction line in the same location as the previous 
thermistor. 
• The thermistor should be at the 12 o'clock position on the tube.
• Smoothly fill the recessed area of the thermistor holder with high thermal conductive 
type sealant. Hoshizaki America part number 4A0683-01 (Silicone Heat Sink Compound 
10-8108 manufactured by GC Electronics), KE-4560 RTV (manufactured by ShinEtsu 
Silicones), or equivalent are recommended. 
• Secure the thermistor with the holder, then insulate it. 
• Be very careful to prevent damage to the leads.
KM-1400SWH-M, 
KM-1400SWH3-M 
Water Regulating 
Valve
Tighten the water regulating valve flare nut to a torque of 39.8 ft-lb/53.9 N·m.