Panasonic FV-08VSL2 User Manual

Page of 16
INSTALLATION    (WOODEN HEADER ) CONTINUED
4. Follow step 5 to 11 of installation   (page 7~ page 8)
    to complete the installation work.
1. Installation in existing construction.
    Installing the fan body in an existing building requires an accessible area (attic or crawl space) above
    the planning installation location or existing ducting and wiring.
(1) To install the fan body, follow the procedures described in lnstallation   . Take the following
      precautions before installation.
(3) Install fan body.
(2) Inspect duct work and wiring before proceeding with installation.
(3) Plan suitable location for fan body. (next to ceiling joist)
(4) Before installation, provide inspection and maintenance access at a location that will not interfere
      with installation work shown in installation    
(5) First, remove ceiling section according to Fig.6 of page 8.
(6) Install fan body.
(1) Inspect duct work and wiring before proceeding with installation. 
(2) Remove ceiling section according to Fig.6 of page 8.
2. Installation from accessible area above fan location. 
CAUTION:
Check area above planning installation location to be sure that:
1. Duct work can be done and that area is sufficient for proper ventilation.
2. Wiring can be run to planning location.
3. No wiring or other obstructions shall interfere with installation. 
Junction box 
Circular duct
6 Long screws
(ST4.2X20)
Junction box 
Green wires
Conduit
Wire nut
Lead wires
Fig. 21
INSTALLATION     (IN EXISTING CONSTRUCTION ) 
12