Viking AF/AR User Manual

Page of 26
Performance Checklist
50
h
Verify cabinet size.
h
Verify electrical supply and water supply
(if applicable).
h
Install anti-tip device(s) and verify unit is
secure.
h
Position unit in cutout, level at desired
height, and secure unit.
h
Plug-in unit and verify operation.
h
Connect water supply (if applicable).
• Verify icemaker fill tube is properly
inserted.
• Verify icemaker bailarm is down.
• Verify dispenser operation
(if applicable).
h
Align/square door(s).
h
Verify drain pan is properly installed and
there are no leaks in water connection.
h
Install kickplate.
h
Remove internal packaging and labels
and wipe unit down.
Installer’s information:
Installer’s Name:
_____________________________
Installer’s Company:
_________________________
Date: ________________________________________
49
Open door. Display should flash.
Press “ACTIVATE CONTROLS” button pad and close
door.
Note: There is a 6 minute delay before the unit starts.
25
26