Antunes, AJ VCT-20 User Manual

Page of 28
VERTICAL CONTACT TOASTER
10
P/N 1010729 Rev. C 05/04
VERTICAL CONTACT TOASTER
11
P/N 1010729 Rev. C 05/04
SERVICING CONVEYOR BELTS
After a period of time, the conveyor belt links will wear 
and the conveyor belt will stretch.  This will eventually 
cause the conveyor to jam as it rotates on the sprock-
ets.  This is easily remedied by removing one or more 
conveyor links from each side of the belt.
There are four 1/2” pitch links on each conveyor belt.  
The rest of the links are 3/4”.
   1.  Remove conveyor belt as described previously on 
page 10.
   2.  To shorten a stretched conveyor belt, remove one 
1/2” link from the belt. 
   3.  Reassemble the belt to the sprockets as 
described below. 
NOTE: If the belt is too short (tight) to be reas-
sembled, remove an additional 1/2” link and install 
a 3/4” link. This will make the conveyor belt 1/4” 
shorter and enable it to be reassembled.
IMPORTANT: This is not covered under warranty.  
It is a user responsibility.
REPLACING CONVEYOR BELTS
   1.  Remove old conveyor belt as described previ-
ously on page 10.
   2.  Place replacement conveyor belt on top sprock-
ets.  Check for correct positioning (Figure 8).
NOTE: Install conveyor belt so that the ends of the 
hooks are facing down.
   3.  Wrap conveyor belt around lower sprockets and 
connect by hooking both ends of the belt back 
together.  A needle-nose pliers may be required.
   4.  Re-intall front and rear conveyor covers, release 
sheet and heat shield.
Replacing Spring Tensioners
   1.  Remove acorn nuts (Figure 9).
   2.  Remove old spring tensioner assy.
   3.  Replace tensioner assy. and reassemble. 
MAINTENANCE (continued)
Figure 8. Removing Conveyor Belt
Rotation
Upper Yellow Support Rod
Large Link
P/N 0800121
Small Link
P/N 0800204
Rear Conveyor Cover Assy.
Weld Screws
Acorn Nuts
Tensioner Assy.
Teflon Tape
Figure 9. Replacing Spring Tensioner Assy.