3com S27x User Manual
C-2
PathBuilder S24x, 26x, and 27x Switch Error Codes
Note
During a warm start, display sequencing starts with the “L2” code.
48
OFF
ON
FLASH write failure
49
OFF
ON
Read error on Port 6
60
OFF
ON
Local DRAM exhausted
8.8.
ON
OFF
PBIST (~3 seconds)
(Blank)
OFF
OFF
PBIST lamp-off test (~.5 seconds)
L0
OFF
OFF
Load Phase 0—PROM IPL loads the FLASH
IPL image, (~ 1 second)
IPL image, (~ 1 second)
L1
OFF
OFF
Load Phase 1—FLASH IPL decompresses and
loads the FBIST image (~ 1 second)
loads the FBIST image (~ 1 second)
(Rotating segments)
ON
OFF
FBIST lamp test (~ 2 seconds)
L2
OFF
OFF
Load Phase 2—FLASH IPL decompresses and
loads the ONS image (several seconds)
loads the ONS image (several seconds)
L3
OFF
OFF
Load Phase 3—STARTUP inventories the
modules in ONS image (~ 3 seconds)
modules in ONS image (~ 3 seconds)
L4
OFF
OFF
Load Phase 4—SYSINIT inits memory mgmt.
and all ONS modules (~10 seconds)
and all ONS modules (~10 seconds)
CR
OFF
ON
PathBuilder S24x, 26x, and 27x switch has
crashed
crashed
(Blank with flashing
dashes)
dashes)
OFF
OFF
Normal system operation
Numeric
Display (continued)
Status
LED
Service
LED
Description/Comments