Acronis Backup & Recovery 10 Adv WS TIDLBPDES User Manual

Product codes
TIDLBPDES
Page of 360
 
A backup plan status is derived from the results of the last run of the plans' tasks. 
 
State 
How it is determined 
How to handle 
Error 
At least one task has 
failed. 
Otherwise, see 2 
Identify the failed tasks -> Check the tasks log to find out the 
reason of the failure, then do one or more of the following: 
• 
Remove the reason of the failure -> [optionally] Start the 
failed task manually 
• 
Edit the local plan to prevent its future failure in case a 
local plan has failed 
• 
Edit the backup policy on the management server in case 
a centralized plan has failed 
When creating a backup plan or policy the administrator can 
turn on the option to stop executing the backup plan as soon 
as the backup plan gets the Error status. The backup plan's 
execution can be resumed using the Restart button. 
Warning 
At least one task has 
succeeded with 
warnings. 
Otherwise, see 3. 
View the log to read the warnings -> [optionally] Perform 
actions to prevent the future warnings or failure. 
OK 
All the tasks are 
completed successfully. 
No action is required. Note that a backup plan can be OK in 
case none of the tasks has been started yet or some of the 
tasks are stopped or being stopped. These situations are 
considered as normal. 
 
 
Task states 
A task can be in one of the following states: IdleWaitingRunningStoppingNeed interaction. The 
initial task state is Idle
Once the task is started manually or the event specified by the schedule occurs, the task enters either 
the Running state or the Waiting state. 
Running 
A task changes to the Running state when the event specified by the schedule occurs AND all the 
conditions set in the backup plan are met AND no other task that locks the necessary resources is 
running. In this case, nothing prevents the task from running. 
Waiting 
A task changes to the Waiting state when the task is about to start, but another task using the 
same resources is already running. In particular, more than one backup or recovery task cannot 
run simultaneously on a machine. A backup task and a recovery task also cannot run 
simultaneously. Once the other task unlocks the resource, the waiting task enters the Running 
state. 
A task may also change to the Waiting state when the event specified by the schedule occurs but 
the condition set in the backup plan is not met. See Task start conditions (p. 107) for details. 
Need interaction 