GE p2s975semss Installation Instruction
TOOLS YOU WILL NEED
1
MATERIALS YOU MAY NEED
31-10641-1
03-07 JR
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com
In Canada, call 1.800.361.3400 or Visit our Website at: www.geappliances.ca
Installation
Self-Cleaning Dual Fuel
Instructions
Slide-In Range
P2S975
BEFORE YOU BEGIN
Read these instructions completely
and carefully.
and carefully.
•
IMPORTANT
— Save these
instructions for local inspector’s use.
•
IMPORTANT
— Observe all
governing codes and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these
instructions for future reference.
• Product failure due to improper installation
is not covered under the Warranty.
WARNING
— This appliance must
be properly grounded.
• Proper installation is the responsibility
of the installer and product failure due
to improper installation is NOT covered
under warranty.
to improper installation is NOT covered
under warranty.
IN THE COMMONWEALTH OF
MASSACHUSETTS:
MASSACHUSETTS:
• This product must be installed by a
licensed plumber or gas fitter.
• When using ball-type gas shut-off valves,
they shall be the T-handle type.
• A flexible gas connector, when used, must
not exceed 3 feet.
PARTS INCLUDED
Anti-Tip Bracket
Anchor Sleeves
Lag Bolts
(For Concrete Floors Only)
Shut Off Valve
Pipe Fittings
CSA-Approved Flexible Gas Line
3/8
″ Min. ID, 1/2″ NPT Connection,
3-foot Maximum Length (Massachusetts only)
Joint Sealant
Wrench or Pliers
(for 1-7/16” Nut)
Level
1/4” Nut Driver
Safety Glasses
Drill
Tape Measure
Screws
Rear Filler
2 Screws
Phillips Head
Screwdriver
Pipe Wrench
Flat-blade
Screwdriver