206
Base Unit
3. Make sure the latch engages (B).
4. Connect the power cord to the power source.
5. Turn on the ADIC Gateway.
Base Unit
Attention: Follow all ESD-sensitive parts procedures while perform-
ing this procedure. For ESD information, see “Handling ESD-Sensi-
tive Parts” on page 197.
This procedure describes how to remove and replace the ADIC Gateway base.
1. Mark and remove the cables (see “Preparing for Removal and Replacement”
3. Remove the cover. See “Removing the Cover” on page 201.
Prepare the New Base Unit
Removing and Replacing the FRUs
Attention: Follow all ESD-sensitive parts procedures while performing
this procedure. For ESD information, see “Handling ESD-Sensitive
Parts” on page 197.
This procedure describes how to transfer the FRUs from the original ADIC
Gateway to the new ADIC Gateway base unit.
1. Set the new ADIC Gateway base next to the original ADIC Gateway.
2. Remove the cover. See “Removing the Cover” on page 201.
3. For each populated PMC slot, remove the PMC card from the original unit to
4. Transfer the bulkhead plates on the unoccupied PMC slots of the original unit
to the new ADIC Gateway base (see “Bulkhead Panel” on page 207).
5. Remove the DDF board (see page 204) and place into the new ADIC
Gateway base. Replace ADIC Gateway cover (see “Replacing the Cover” on
page 201)
.