Jet 131000 1ss-3c-10 - 1-ton capacity 10-ft 3-phase electric chain hoist User Guide

Page of 48
 
14
Replacing Load Chain 
Over time, the load chain will wear or elongate. 
This can cause damage to the hoist, breakage, or 
non-engagement of the load sheave. The following 
procedures describe replacing the load chain for 
single and multiple fall hoists. These procedures 
should be performed by experienced personnel 
only. 
How to Cut Chains 
Use a bolt cutter with special cutter jaws for cutting 
hardened chain. Cut only one side of the link at a 
time. When making the second cut, place a mat 
over the chain to catch the flying chain section. 
Making a C-Link 
Replacing load chain will require the use of a C-link 
(in some cases, two C-links), which you can easily 
make as follows: 
1.  Cut a link from the old chain. 
2.  Cut the weld from the link leaving an opening 
approximately 1.25 times the diameter of the 
link material. See Figure 15. 
3.  Grind the cut areas smooth and remove all 
burrs. 
 
Figure 15 
Single Fall Chain Hoist 
1.  Lower the load hook until only 1 to 2 feet of 
slack chain remains in the chain container. 
2.  Remove chain container. 
3.  On the slack side of the chain, remove the 
chain stop and the spring (Figure 16). Keep 
these handy for later re-installing. 
4.  Using a C-link, connect the new chain to the 
old chain. Be sure vertical link welds face 
away from load sprocket (see Figure 17). 
5.  Keep tension on both sides of the chain and 
lower the load hook to pull the new chain 
through the hoist. Do not let the chain twist or 
bind as it is being pulled through the hoist. 
 
Figure 16 
6.  Stop hoist when 1 to 2 feet of new chain 
remains on the slack side. 
7.  Install the spring and chain stop on the slack 
end of the chain. 
8.  Remove the load hook and the spring from the 
old chain, and install them on the new chain. 
Inspect condition of both spring and hook. 
9.  Lower load hook until the limit switch stops 
hoist movement. Inspect the chain for any 
signs of twist. 
10. 
Install chain container following the 
instructions in this manual. Do not fill chain 
container by hand.  
11. It is recommended that after installing new 
chain, the first few lifts be limited to no more 
than 25-50% of the rated load. Thoroughly 
Inspect chain for twist before placing hoist in 
routine service. 
Vertical and Horizontal Links 
Vertical and horizontal are determined by the 
relationship with the load sprocket. Vertical links 
will be guided by the center slit in the load 
sprocket. Horizontal links will engage in the oval 
pockets on the sprocket. See Figure 17. 
 
Figure 17