SECTION TWO: Installing and wiring the 957
Page 10
957 Installation Manual, Revision C1
Yoke-mounting the 957
Before drilling, turn the 957 to the desired angle on the yoke to
make sure there’s enough space for the cables. Leave clearance
space as follows:
make sure there’s enough space for the cables. Leave clearance
space as follows:
•
at least 2 inches of space all around the sides and the top
•
at least 2.5 inches of space in the back for all of the cables
and connectors
and connectors
•
at least 2.25 inches of space in the front for opening and
closing the chart cartridge door and inserting and
removing a chart cartridge
closing the chart cartridge door and inserting and
removing a chart cartridge
For an illustration of the recommended clearances, see Figure 3
and Figure 4 on the following pages.
and Figure 4 on the following pages.