GE zem200bf Installation Instruction

Page of 16
Installation Preparation
Micr owav e Oven
Tools and materials required:
• 3-prong grounded electrical receptacle.
• Electrical cable, 2-wire with ground, No. 14 minimum,
as required.
Monogram microwave ovens require a 120
volt, 60 Hz power supply, protected by a time
delay fuse or circuit breaker.
These ovens are supplied with a power cord
40" long for which a properly grounded
3-prong electrical receptacle is required.
• 800 watt* oven draws 1300 watts, with a
12.5 amp load.
*IEC-705 test procedure
Note: Do not use an extension
cord with these appliances.
In-wall
installation
• Install a 3-prong grounded receptacle.
• Receptacle may be within opening (shaded
area in diagram):
– If using this installation, be sure opening is
sufficiently deep to accommodate power
cord and plug (18" min.).
• Receptacle may also be placed outside
shaded area, within reach of oven’s 40"
power cord. In this case, opening need only
be 16" deep.
Electrical
supply
6
18" Min.
Receptacle
Inside
16" Min.
Receptacle
Outside
24-7/8" 
±
 1/16"
15" 
±
 1/16"