Extreme 3802 Hardware Manual

Page of 352
 
Installing the Alpine 3808 and the Alpine 3804 DC Power Supply
Extreme Networks Consolidated Hardware Guide
143
Mount the chassis in a rack—For more information about mounting the chassis, see “Installing the 
Chassis” on page 132.
Ground the chassis—For more information about grounding the chassis, see “Grounding the Alpine 
3800 Series Chassis” on page 135.
To turn on power to the system, connect the power cable to the power supply and then to the wall 
outlet. 
In the event of a power supply failure, please contact Extreme Networks about servicing and replacing 
your power supply.
NOTE
Alpine 3802 power supplies must be removed and replaced by personnel that have been trained by 
Extreme Networks.
Verifying a Successful Installation 
After you supply power to the Alpine switch, the switch performs a power-on self test (POST).
During the POST:
All ports are temporarily disabled
The packet LED is off
The power LED is on
The MGMT LED flashes until the switch successfully passes the POST
If the switch passes the POST, the MGMT LED blinks at a slow rate (one blink per second). If the switch 
fails the POST, the MGMT LED shows a solid yellow light.
NOTE
See Chapter 9, “Alpine 3800 Series Switch Management Module” for more information about switch 
management module LED activity and Chapter 10, “Alpine 3800 Series I/O Modules” fo
r more 
information about I/O module LED activity.
Installing the Alpine 3808 and the Alpine 3804 
DC Power Supply
This section describes the steps to successfully install and power your Alpine 3808 or Alpine 3804 DC 
power supply:
Selecting the cabling
Installing the DC power supply 
Attaching the cabling and supplying power 
Verifying a successful installation
For centralized DC power connections, install only in a restricted access area.