Extreme 3802 Installation Guide

Page of 394
 
378
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Installing the Summit Option Card and XENPAK Modules
This appendix provides instructions to install the option card and the uplink module.
NOTE
The Summit XGM-2xn Option Card requires ExtremeWare 7.4 or later. Be sure to upgrade your Summit 
switch to ExtremeWare 7.4 (or later) before you install a Summit XGM-2xn Option Card. Installing a 
XGM-2xn Option Card without the correct supporting software might prevent the switch from booting.
Installing the Summit Option Card
CAUTION
The Summit option card cannot be hot-swapped. Before installing the Summit option card in the Summit 
400-48t switch, you must turn off the switch. Use only XENPAK modules approved by Extreme 
Networks.
To install the Summit option card:
1
If you are installing a Summit XGM-2xn Option Card, upgrade the software in your switch to 
ExtremeWare 7.4 (or later).
2
Disconnect the AC power from the Summit switch.
3
Using a number 1 Phillips screwdriver, remove the filler panel from the option slot on the back of 
the switch (Figure 180). Save the screws for re-use.
Figure 180: Removing the option slot filler panel
4
Align the edges of the sheet metal with the card guides, and carefully slide the option card into the 
switch housing until the connectors engage and the option card is flush with the back panel of the 
switch (Figure 181).
ZR XENPAK 
SR XENPAK
Table 135: ZR XENPAK Combinations
Left Slot
Right Slot
ES4K041
Filler Panel