Acer 4400 User Guide

Page of 100
Chapter 1
Getting Started  
4
Preinstallation
The preinstallation process involves the following activities:
Selecting a site
Unpacking components
Selecting a Site
Consider the following when selecting a site for your 
computer:
Determine the best site for your system.  Cable paths 
should not run near equipment that might cause 
electromagnetic or radio frequency interference such as 
radio transmitters, televisions, copy machines, or heating 
and air-conditioning equipment.
Route cables away from personnel and equipment traffic.
Avoid dusty areas and extremes of temperature and 
humidity.
Unpacking Components
Unpack the contents of each box carefully.  Save all packing 
materials in case you need to move or ship the system in the 
future.
Check that all items are present and in good condition.  
Contact your dealer immediately if anything is missing or 
damaged.
Ap4400-e.book  Page 4  Friday, October 1, 1999  2:09 PM