3com 3c16460 User Guide

Page of 8
WARNING: RJ45 ports. These are shielded RJ45 data 
sockets. They cannot be used as telephone sockets. Only 
connect RJ45 data connectors to these sockets.
AVERTISSEMENT:
 
Les ports RJ45. Ceux-ci sont les prises 
de courant de données RJ45 protégées. Ils ne peuvent pas 
être utilisés comme prises de courant téléphoniques. 
Brancher seulement les connecteurs RJ45 de données à ces 
prises de courant.
WARNUNG: RJ45 Ports. Hierbei handelt es sich um 
abgeschmirte RJ45 Datenbuchsen, die nicht als 
Telefonbuchsen verwendbar sind. Nur RJ45 
Datensteckverbinder an diese Buchsen anschließen.
10
MDI Switch (for port 14)
Ports 13 is fixed as an MDIX port so that it can be connected directly 
to DTE which have MDI ports using normal ‘straight through’ TP 
cables.
Port 14 is ‘switch selectable’ using the MDI Switch. The port can be 
an MDIX port (to connect directly to DTE like port 13), or an MDI 
port (to connect to other units using a normal ‘straight through’ TP 
cable).
To connect a 10BASE-T or 100BASE-TX unit to the Baseline Switch, 
connect an MDIX port on the other unit to port 14 on the Baseline 
Switch, as shown below. Ensure that the MDI switch on the Baseline 
Switch is IN (MDI). If an MDI/MDIX port is used on the other unit, 
ensure that the MDI switch for that port is OUT (MDIX).
11
Self-adhesive Pads
The Baseline Switch is supplied with four standard height and two 
reduced height self-adhesive rubber pads. Usage of the feet depends 
on where the Baseline Switch is placed:
Q
Use the four standard height pads if the unit is to be placed 
on a flat surface or stacked with another SuperStack II product 
of the same dimensions.
Q
Use the two reduced height pads and two of the standard 
height pads if the unit is to be stacked on a SuperStack II unit 
of different dimensions — Line up the front of the units, and 
use the two standard height pads at the front (to fit the recess 
of the unit beneath) and use the two reduced height pads at 
the back.
Do not apply the pads if you intend to rack or wall mount 
the unit.
If the unit is to be part of a free standing stack, apply the pads to 
each marked corner area on the underside of the unit. Place the unit 
on top of the lower unit, ensuring that the pads of the upper unit 
locate with the recesses of the lower unit.
Positioning the Baseline Switch
CAUTION: When installing the Baseline Switch in a stack of 
different size units, the Baseline Switch must be installed 
above the larger units.
When deciding where to position the Baseline Switch ensure:
Q
It is accessible and cables can be connected easily.
Q
Cabling is away from:
Q
sources of electrical noise such as radios, transmitters and 
broadband amplifiers.
Q
power lines and fluorescent lighting fixtures.
Q
Water or moisture cannot enter the case of the unit.
Q
Air flow around the unit and through the vents in the side of 
the case is not restricted (3Com recommend that you provide 
a minimum of 25mm (1in.) clearance).
To prolong the operational life of your units:
Q
Never stack units more than six high if free standing, and 
ensure that cables are supported so that they do not cause the 
stack to fall over.
Q
Do not place objects on top of any unit or stack.
Q
Do not obstruct any vents at the sides of the case.
Rack or Wall Mounting
The Baseline Switch can be mounted in a 19-inch equipment rack, or 
wall-mounted using the Mounting Kit. Refer to 
.
Power Up
Use the following sequence to power up the Baseline Switch:
Q
Check the network connections and cables.
Q
Connect the power supply cable to the appropriate power 
socket on the rear panel of the unit. Refer to 7 or 8.
Q
Connect the plug to the power supply outlet socket and 
switch on the power supply at the socket. If you are using the 
Advanced Redundant Power System, ensure that it is switched 
on.
When the Baseline Switch is powered on, the Power LED should be 
lit. If it is not, refer to 6.
Spot Checks
At frequent intervals you should visually check the Baseline Switch. 
Regular checks can give you an early warning of a possible failure; 
any problems can then be attended to when there will be least 
effect on users. Check the following:
What To Do Next?
If the Baseline Switch fails to operate successfully, contact your 
supplier with the following information before returning the unit:
Q
product number and serial number
(printed on a label on the bottom of the unit)
Q
a brief description of the fault
When returning any equipment to your supplier ensure that the 
equipment is packed suitably for transit.
Out
In this position you can connect port 14 to a 
workstation or any other DTE using a normal 
‘straight through’ TP cable.
In
In this position you can connect port 14 to any 
MDIX port on a 10BASE-T or 100BASE-TX unit 
using a normal ‘straight through’ TP cable.
MDIX
MDI
i
Cabling
Check that all external cabling connections are 
secure and that no cables are pulled taut.
Cooling fans
Check that the cooling fan is operating by 
listening to the unit. The fan is fitted near to 
the front right hand side of the unit (when 
viewed from the front).
4