Gestetner 5450 Reference Manual

Page of 102
55
Testing a Memory
Upgrade
The simplest way to test a memory upgrade
performed on the controller is to do the following:
1) Check status lights on the controller front panel.
After performing a power-on self check, the
controller should show the status light condition
for “Ready to print”, as shown in Figure B-1.11.
(See Appendix B, Controller Status Lights, in the
Controller User’s Guide, for a complete listing as
to what conditions are indicated by the status
lights, and how to interpret them.)
Figure B-1.11.  ‘Ready to Print’ status light
condition.
2) Print a Diagnostic Test Page (see Diagnostic Test
Page in Appendix A of the Controller User’s
Guide if you need instructions), and note the area
on the report which states the amount of memory
available to the printer, as shown in Figure B-
1.12.