Avaya 10bs User Guide

Page of 12
Feature and Planning Review
The Integrated Solution on III environment allows integrated administration as 
follows:
1.
2.
3.
A portion of the switch database for extensions and adjuncts is
downloaded from the switch to the Extension Directory. The Extension
Directory contains the System Numbering Plan information already
administered for the switch.
Changes are made in the Extension Directory when the System
Manager enters data.
When the changes made in the Extension Directory will affect how the
switch operates, they are uploaded to the switch as programming
requests. This programming is done automatically, as the database
changes are made, and is transparent to the person making the
changes.
Reconciliation
Programming changes made at the switch cannot be automatically sent to the
Extension Directory. To keep the databases synchronized, when changes are
made at the switch, run the reconciliation program to download the revised
information to the Extension Directory.
See the Integrated Solution III for MERLIN LEGEND Communications System
System Manager's Guide,  Chapter 4, for the procedure for running the
reconciliation program.
2-8