Summit sbc490 Specification Guide

Page of 18
Note:
 
allow the beer dispenser to stand in an upright position for 8-10 hours before 
turning on.  Once all four casters have been tightened evenly, stand the cabinet in an 
upright position.
 
 
DRAFT ARM ASSEMBLY 
*Slide gasket over wing nut on bottom of draft arm assembly beer tubes. Slide gasket 
  beer tube to draft arm base. 
 
*Push wing nut on beer tube of draft arm assembly through hole in top of cabinet until 
  the draft arm is resting on cabinet top 
 
*Align holes in draft arm base with holes in gasket and pilot holes in cabinet, then 
  secure guard rail with eight small screws. 
 
 
GUARD RAIL 
*Place guard rail on top of the cabinet 
 
*Align all holes of the guard rail with the holes of the cabinet 
 
*Secure the guardrail to the cabinet with the eight small Phillips-head screws  
 
CO
2
 REGULATOR AND CO
2
 CYLINDER 
Note: Your CO
2
 cylinder is shipped empty to avoid and possible accidents during 
transportation. When you purchase the first keg of beer, have your beer distributor 
fill the CO
2
 cylinder. You must read and understand the following procedures for 
CO
2
 cylinders before installation: 
 
*Install the CO
2
 gas line tube to the regulator by attaching one end of the red tube to the 
hose bard connection on the CO
regulator.  
 
*Secure the tube by using one of the self locking black plastic snap-on clamps. 
 
*Insert a special washer into the regulator to cylinder attachment nut 
 
*Attach the CO
2
 regulator to the CO
cylinder by screwing the regulator nut onto the 
  cylinder valve and tightening with an adjustable wrench. 
 
*Remove the bolt with the nut from the cylinder retainer. Using two screws attach it 
  inside the unit on the left side of the back wall. Holes are pre-drilled and screws are 
  included. 
 
*Slide the cylinder through the retainer and secure it with the bolt and the nut. Position 
  the cylinder this way so that you will be able to read the numbers on the gauges and 
  easy access shut-off valves.  
 
9