Eaton IPV42AB-EP1-C20 User Manual

Page of 7
© 2008 Eaton Corporation. All Rights Reserved. All specifications are subject to change without notice.
www.pulizzi.com • pulizzisales@eaton.com • 800-870-2248 • Fax: 605-334-4999 
3
PHYSICAL
Vertical mount
V42: Height 42” Including mounting brackets
Height 38” without mounting bracket attached 
Width 2.0” x Depth 1.89” 
V70: Height 70” including mounting brackets 
Height 66” without mounting bracket  
 
attached. Width 2.0” x Depth 1.89” 
(3.5” at circuit breaker cover)
18 gauge steel, powder coat black with   
   white silkscreen
Detachable mounting brackets allow for 
several mounting options
POWER INPUT
Power cable with plug is attached at the 
bottom of the unit through a cable grip
Power cable is UL type SOOW or SJT
NEMA style power input plug is attached
AB versions have a C20 power  
 
inlet to allow for various power cables 
to be used with the unit
OVERLOAD CIRCUIT PROTECTION 
(C1, C5, F3 ONLY)
Electromagnetic circuit breakers to prevent 
temperature from affecting the trip point
Long time delay curve to prevent nuisance 
tripping from power supply or motor start up 
surges
Rated for use as a switch for off/on control
Easily reset after an overload or fault 
Circuit breaker trip guards are provided to 
prevent accidental tripping
UL listed branch circuit breaker are provided 
where required by UL 60950-1 standards
POWER OUTLETS
IPV42 has (8) and IPV70 has (16) or (24) 
outlets depending on the version
IEC C13 “computer style” or NEMA 5-15 
“standard 3-prong” depending on the version
CURRENT MONITORING
Front panel display shows current draw of 
connected equipment
Two digit display shows current from 0-30 
amps with true RMS accuracy
Monitor will help to prevent system overload 
and ease installation
INDICATOR LIGHT
One LED indicator light per circuit breaker
Light illuminates when the circuit breaker is in 
the on position and power is present at the 
input
One LED indicator per outlet, on when the 
outlet power relay is on
OUTLET CONTROL
Individual on/off/reboot outlet control via 
software interface to control equipment   
remotely
Auto scheduler allows for  
 
 
scheduling power on/off/reboot events 
(daily and weekly events) 
Outlets can be controlled based on  
 
temperature, humidity, current, voltage or 
switch thresholds 
SOFTWARE SECURITY
User name/password security
Settings allow the administrator to  
 
disable unused interfaces
ENVIRONMENTAL
Monitor temperature at 2 locations
and humidity with optional sensors
Contact closure inputs to monitor 
switch open or closure
SOFTWARE INTERFACES
Web interface provides a graphic  
 
control interface through a web  
 
browser (IE, Netscape, Mozilla)
Telnet interface provides a text menu    
control interface with any terminal  
 
emulation software  
SNMP allows read/write capability with   
trapping
E-mail notification system provides e-mail 
alerts or logs showing user activity
Serial interface provides a text menu 
control interface with any terminal 
emulation software
FTP utility allows firmware upgrades 
SOFTWARE FEATURES
Administrator and multiple users can be 
configured
User level access can be limited to specific 
outlets
Unit and outlet names can be configured
Outlet groups can be created to perform 
an action on multiple outlets at once
Outlet control includes individual,  
 
group and all outlet global control
Outlet actions include on/off and reboot
Global sequence allows all the outlets to 
be turned on or off in a preset sequence 
up to 999 seconds
Outlet reboot automatically turns an outlet 
off and back on with one command at a 
preset time up to 999 seconds
E-mail notification allows up to two 
e-mail addresses to receive notifications 
of alerts or events
AUTO-EVENT SCHEDULING
Administrator can configure on or off    
events for outlets or groups. The event   
occurs at the preset time daily or weekly 
IPV
-
-
Option 2
A1
 = 120V/15A input, 15A outlets
A2 =  120V/20A input, 15A outlets
A5 = 120V/20A input, (24) 15A outlets
AB = 100-240/20A input, C13 outlets
C1 = 120V/30A input, 15A outlets, L5-30P (1 2P breaker)
C5 = 120V/30A input, 15A outlets, L5-30P (2 1P breakers)
F3 = 240V/30A input, C13 outlets, L6-30P
K1 = 3 Phase 120/208 20A, 120 volt 15 amp outlets, L21-20P
M1 = 3 Phase 120/208 20A, 208 volt C13 outlets, L21-20P
M5 = 3 Phase 208 20A, 208 volt C13 outlets, L15-20P
Option 1
42
 = 42” height with brackets
70 = 70” height with brackets
Option 5
09S
 = 9 foot power cable, straight plug
09L =  9 foot power cable, locking plug
15S = 15 foot power cable, straight plug
15L = 15 foot power cable, locking plug
C20 = C20 inlet, no cable C20
power inlet option (AB Only)
Option 4
1
 = Local Display current meter
Option 3
EP 
= Environmental, strapping, power 
monitoring (voltage/current)
IPV “Design Your Own” part number guide
EP 1