ASUS GP-105 Quick Setup Guide

Page of 2
Quick Start Guide
GP-105 
5-Port Gigabit Switch with 4-port PoE
Q10693 / First Edition / July 2015
NOTE: Contact your dealer or retailer if any of the items is damaged or missing.
Setting up GP-105
1.   Installing the switch.
2.  Connecting your devices.
a.   Connect one end of the power cable to GP-105 and the other end to a power outlet. The power LED 
and system LED turn to solid green.
b.   Connect your devices to PoE ports 1~4 with RJ-45 cables. The switch automatically provides power to 
802.3at/af-compliant PoE devices.
c.   Insert an RJ-45 cable to the Gigabit port of the GP-105 to connect it to your existing network  (via 
modem, router, hub, or access point).
Package Contents
ASUS PoE switch x 1
Power cord x 1
Mounting bracket x 2
Screw x 8
Rubber foot x 4
Quick Start Guide x 1
1.1 On a desktop
  a.  Peel the adhesive backing paper from the four rubber feet.
  b.  Attach the rubber feet to the four recessed areas on bottom of
GP-105.
  c.  Place the GP-105 on a flat surface.
3.  Checking LEDs.
GP-105 supplies 30W power per PoE port and a total of 80W power across all four ports. Check the 
status of LEDs on the front panel for the remaining power budget.
LED Indicators
Specifications
 
LED Descriptions
Color
Status
Power LED
Solid Green
Power on
System LED
Solid Green
System OK
Solid Amber
Running Power-On-Self-Test
Blinking Amber PoE failed 
PoE Power Budget
Solid Green
20W to 80W PoE power budget remaining.
Solid Amber
15.4W to 20W PoE power budget remaining.
Blinking Amber Less than 15.4W PoE power budget remaining. 
Left LED for Gigabit 
port 1–5: Link/Act
Solid/Blinking
Green
Link established at 1000 Mbps. The LED blinks when 
transmitting and receiving data.
Solid/Blinking
Amber
Link established at 10/100 Mbps. The LED blinks when 
transmitting and receiving data.
Right LED for Gigabit 
port 1-4: PoE status
Solid Green
The PoE power output is less than 15.4W
Solid Amber
The PoE power output is greater than 15.4W but less than 30W
Amber Blinking The PoE power output is requested over 30W
1.2 In a rack
  a.    Before installation, ensure that the rack is stable.
NOTE: GP-105 is compatible with the standard 19" EIA racks.
 b. 
Attach the mounting brackets to the GP-105 with the screws that came with the package.
 c.  Secure the brackets to the rack with suitable screws, which are not included in the package.
WiFi
WPS
Wi-Fi Access Point
IP cam
VoIPs
Internet
10/100/1000 base-T 
LAN
Port 1-5 comply with:
1. IEEE 802.3
2. IEEE 802.3u
3. IEEE 802.3ab
4. IEEE 802.3az
5. Support Half/Full-Duplex
operations
6. Auto-negotiation
7. Auto MDI/MDIX
8. Supports IEEE 802.3x Flow
Control (Full-Duplex mode)
PoE Standard
IEEE 802.3af/at
Maximum PoE Power 
Supply
80W
Maximum PoE Power 
Supply Per Port
30W
Gigabit Port
5 (port 1-5)
PoE Port
4 (port 1-4)
Switching Capability
10 Gbps
MAC Address table size
2K
Packet Buffer memory
1M bit
Wire speed on all ports and 
port options  
Full-wire speed (full-duplex) 
operation on all GE ports
Priority Queue
8 queues
Forwarding Mode
Store and Forward
AC Input
100V ~ 240V, 50/60Hz
DC Output
54V, 2A
Dimension
180mm x 230mm x 44 mm 
(7" x 9" x 1.7")
Weight  
840 g (1.85 lbs)
Operating Temperature
0°c - 40°c (32°f - 104°f)
Operation Humidity
20~ 80%, non-condensing
NA10693_GP-105_QSG.indd   1
2015-08-27   13:47:38