Netgear GSM7328FS - ProSAFE 24 SFP + 4 Gigabit L3 Managed Stackable Switch Hardware Manual

Page of 40
Managed Stackable Layer 3 Switches GSM7328S and GSM7352S Hardware Installation Guide
3-2
Hardware Installation
v1.0, March 2006
Protecting Against Electrostatic Discharge
You can also take the following steps to prevent damage from electrostatic 
discharge (ESD):
1. When unpacking a static-sensitive component from its shipping carton, leave 
it in the antistatic package until you are ready to install it. Just before 
unwrapping the antistatic package, discharge static electricity from your body.
2. Before moving a sensitive component, place it in an antistatic container or 
package.
3. Handle all sensitive components in a static-safe area. If possible, use antistatic 
floor pads, workbench pads, and an antistatic grounding strap.
Unpacking the Hardware
Check the contents of the boxes to make sure that all items are present before 
beginning the installation.
1. Place the container on a clean flat surface and cut all straps securing the 
container.
2. Unpack the hardware from the boxes. 
Carefully remove the hardware and place it on a secure and clean surface. See 
“Select a Location” on page 3-4.
3. Remove all packing material.
Warning: Static electricity can harm delicate components inside your 
system. To prevent static damage, discharge static electricity 
from your body before you touch any of the electronic 
components, such as the microprocessor. You can do so by 
periodically touching an unpainted metal surface on the 
switch.